Ensuite Facelift & Open out chimney

TO GIVE RECESSED SINK & NEW SHOWER

Client wished to replace small cloak-room sink with full sized sink in an ensuite along with a full facelift. This required opening up the fireplace to recess the new sink.

 

  • Remove; Shower cubical, Sink, Tiles
  • Fit ‘aqua-panal’ to shower walls & new shower door
  • Change lighting throughout – including adding two downlight just above the new sink
  • Strip off plaster, open up fireplace, strengthen, add thermal insulation, re plaster
  • Paint throughout
  • Manufacture custom bespoke sink unit to fit new alcove
  • Add electric shaver power outlet
  • New flooring & skirting board
  • Add 4x new double electrical sockets into main bedroom

** Timescales organised to be within clients holiday **

 

 

 

Author: admin